by YAKfletch on Mon Oct 20, 2008 10:17 pm
Things are going a bit slower than anticipated. All of the low voltage wiring has been run along with all the structured wiring. The thing that is holding things up is the interior contractors. The interior wood still needs a second coat of urethane before I can bring in the drywaller. Neither of them of which I can put up the controller and touch screens or break out my servers because I don't want want them damaged. I would guess another 2 months is needed.
Yak